Position № |
Name of object |
Year |
Customer |
Volume of works done, method of their fulfillment |
1. |
Reconstruction of water supply system of Kamenka village (going under the river Kamenka) |
2006 |
Kamenskiy Rural Council |
Pipe ПЕ diam. -110 mm, L=2000 m. Open-cut method and horizontal drilling |
2. |
Construction of Krivoy-Rog – Sofievka water supply system |
2006 |
Private Enterprise «Hydro-Eco» |
Pipe ПЕ diam. -315 mm, L=4000 m. Open-cut method |
3. |
Reconstruction of forcing sewage system in Baykal’skaya Street |
2006 |
Municipal Utility Enterprise Dneprvodokanal |
Pipe ПЕ diam. -630 mm, L= 200 m. Open-cut method |
4. |
Construction of water supply system in Meliorativnoye village |
2007 |
Dneprdorstroy, close trust corporation |
Pipes ПЕ diam. -110 mm, L=900 m. Horizontal drilling |
5. |
Construction of industrial sewage system |
2007 |
Ukrainian Factory of Super Large-Size Tyres, ltd |
Pipe ПЕ diam. -225 mm, L=2300 m. Open-cut method and horizontal drilling |
6. |
Construction of free-flow sewage system in Gusenko Street |
2008 |
Moonlit -SOV, ltd |
Pipe ПЕ diam. -400 mm, L=280 m. Renovation method |
7. |
Reengineering of water supply networks at «Metro-26» Sopping Centre, going under the highway |
2008 |
Yuzhspetshimmash, ltd |
Pipes ПЕ diam. -225-400 mm, L=340 m. Open-cut method and horizontal drilling |
8. |
Construction of water supply networks in Khersonskaya Street |
2008 |
Construction Company Zhilstroyservice, ltd |
Pipe ПЕ diam. -315 mm, L= 475 m. Horizontal drilling |
9. |
Construction of water supply networks, waste-water and storm water sewers in Khersonskaya Str. – Shchorsa Str. – Ushinskogo Str. – Pushkina Ave. |
2008 |
Industrial Join Enterprise Contact-Mokom, plc |
Pipes ПЕ diam. -315, 500, 1000 mm, L=800 m. Open-cut method and horizontal drilling |
10. |
Laying of encasements for power cables and water supply. Construction of water supply system according to the project «Reconstruction of Serova Str. in Dnepropetrovsk city» |
2008 |
UPS, ltd with Foreign Inveatments Merezha-Service, close corporation |
Pipe ПЕ diam. -63, 110, 160, 225, 400 mm, L=452 m. Horizontal drilling |
11. |
Construction of network of waste water sewage system in Berezinskaya Str. – Donetskoe Shosse Highway Sopping Centre «Karavan» |
2008 |
Metropoliya, ltd |
Pipe ПЕ diam. -315 mm, L=430 m, Depth - 4,5-7 m. Horizontal drilling |
12. |
Construction of waste water sewage system network in Sverdlova Street |
2008 |
Siding, ltd |
Pipe diam. -630 mm, L=122 m, depth - 6 m. Horizontal drilling |
13. |
Construction and reengineering of water supply systems in Shchorsa Str. (left and right sides) |
2008 |
MUE Dneprvodokanal, UPS, ltd with Foreign Investments |
Pipe ПЕ diam. -315 mm, L=1100 m. Horizontal drilling |